国产xXx69麻豆国语对白,色欲蜜臀,亚洲精品第一国产综合亚AV,国产亚洲精品久久久久久久久动

冷再生施工和機械租賃業(yè)務
筑路架橋,奉獻社會;以人為本,不斷創(chuàng)新

服務熱線

18264104888

新聞中心

首頁>>新聞中心

冷再生機出租廠家施工的準備工作

來源:http://www.iz8.com.cn/ 日期:2022-08-24 發(fā)布人:
廠家在道路施工前要做好充分的準備工作,才能保障整個施工過程的順利進行,需要做好哪些準備工作呢?冷再生機出租廠家為您講解。
The manufacturer shall make sufficient preparations before road construction to ensure the smooth progress of the whole construction process. What preparations should be made? The rental manufacturer of cold regeneration machine will explain it to you.
1、要建立嚴謹、規(guī)范的內部約束、考核、激勵機制,用制度管人,用規(guī)章管理工程。
1. It is necessary to establish a rigorous and standardized internal restraint, assessment and incentive mechanism, manage people with systems and manage projects with regulations.
2、要補充調查工程沿線影響施工的因素,標注出平面位置圖,并進行、論證,寫出調查報告,作為修訂施工方案、編制施工控制預算的依據。
2. The factors affecting construction along the project shall be supplemented and investigated, and the plane position map shall be marked, and the investigation report shall be made and demonstrated as the basis for revising the construction scheme and preparing the construction control budget.
3、施工圖紙,吃透設計意圖,澄清圖紙中的問題,恢復定線和施工放樣。對所有控制點進行加密、保護、記錄。
3. Construction drawings, understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4、根據施工合同協(xié)議和現(xiàn)場調研認真編制施工控制預算,作為控制支出、進行成本預測分析、經濟核算以及統(tǒng)計工程進度的依據。
4. The construction control budget shall be carefully prepared according to the construction contract agreement and on-site investigation as the basis for controlling expenditure, cost prediction and analysis, economic accounting and statistics of project progress.
冷再生機出租
5、進行業(yè)務、技術培訓和技術交底,使相關人員對工程的技術標準、操作規(guī)程、質量控制、資料整理有的了解。
5. Conduct business, technical training and technical disclosure to make relevant personnel have a comprehensive understanding of the technical standards, operating procedures, quality control and data sorting of the project.
6、建立工地試驗室,并申請臨時資質。對施工中擬使用的各種原材料取樣試驗,建立相關技術參數的數據庫。
6. Establish site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in the construction, and establish a database of relevant technical parameters.
7、繪制關鍵工序施工工藝流程圖和試驗操作規(guī)程、質量檢查評定、計量支付、設計變更、事故處理等操作管理框圖,并使圖表上墻。
7. Draw the construction process flow chart of key processes, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident treatment and other operation management block diagrams, and put the charts on the wall.
8、根據工期要求、技術標準、機械設備能力、材料供應、自然條件等進行綜合分析,選擇佳施工方案,完善施工組織設計。
8. Conduct comprehensive analysis according to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., select the best construction scheme and improve the construction organization design.
為了各方面的著想,以上八點準備工作希望您能夠好好了解,更多內容就來我們網站http://www.iz8.com.cn咨詢吧!
For the sake of safety in all aspects, I hope you can have a good understanding of the above eight preparations. Come to our website for more information http://www.iz8.com.cn Consult!

閱讀/ Recommended reading

  在道路施工的 “戰(zhàn)場” 上,水泥撒布車如同精準的 “材料輸送兵”,而其料倉內的物料存量監(jiān)測,則是保障施工順利進行的關鍵環(huán)節(jié)。如何讓施工人員隨時掌握料倉內水泥的 “儲備情況”,...

冷再生機租賃:路面 “回春妙手” 能解哪些難題? 2025-07-02
冷再生機租賃:道路養(yǎng)護的 “省錢省力魔法棒” 2025-07-01
冷再生機租賃:解鎖路面 “煥新” 的全能技能包 2025-06-24
舊路翻新 “神器” 大盤點:那些給力的冷再生機型號 2025-06-20

產品/ Recommended products